480 kWp rooftop
Food manufacturer, Telford
1,120 panels across three production-hall roofs, installed in four phases without stopping a shift. Around 62% of generation is consumed on site during operating hours.
MCS certified installer · RECC member · TrustMark registered
Nationwide UK coverage · Mon–Fri 8am–6pm, Sat 9am–1pm
Commercial & industrial
We take commercial schemes from half-hourly data analysis and roof survey through design, DNO application, procurement, installation and commissioning — then maintain them. One contract, one accountable party.

Capacity
The engineering, the grid process and the programme all shift with scale. Here is roughly where the lines fall.
Single warehouse, workshop or retail roof. Usually G99 connection, often no grid reinforcement needed. 2–4 weeks on site.
Multi-roof or large distribution units. Structural survey and half-hourly data modelling drive the design. 4–10 weeks on site, phased around operations.
Ground-mount and large industrial estates. Grid connection studies, land and planning work run in parallel with the design.
Return on investment
Scope
Recent work
480 kWp rooftop
1,120 panels across three production-hall roofs, installed in four phases without stopping a shift. Around 62% of generation is consumed on site during operating hours.
310 kWp rooftop
Roof-load calculations governed the layout; ballasted non-penetrating mounting on a single-ply membrane, with the membrane warranty preserved.
1.2 MWp ground-mount
Grid connection secured before ground works. Sheep grazing retained under the array on a 2.1 m panel clearance.

Brochure
A 12-page PDF covering our EPC process, typical programme durations, insurance and accreditation details, and three worked case studies with measured output data.
Placeholder: attach the real PDF once it's ready and this becomes a direct download.
Send us your site address, roof age and 12 months of half-hourly data if you have it. We'll come back with an indicative capacity, yield and payback range before asking for a site visit.